BLDG 3001 Building Design Process
Credit Points 10
Legacy Code 301087
Coordinator Marini Samaratunga Opens in new window
Description Building design is an iterative process. In this subject students will gain experience in generating design proposals and responding to simulated client and stakeholder feedback. Holistic designsolutions that address economic, environmental and social issues (triple bottom line assessment) will be generated for realistic building projects.
School Eng, Design & Built Env
Discipline Building
Student Contribution Band HECS Band 2 10cp
Check your fees via the Fees page.
Level Undergraduate Level 3 subject
Pre-requisite(s) BLDG 3007
Learning Outcomes
On successful completion of this subject, students should be able to:
- Respond to a design brief for a building project in western Sydney with a series of potential building design solutions.
- Evaluate the appropriateness of several different solutions to the building design problem especially relating to current building regulations.
- Recommend a particular preferred solution arguing its benefits in terms of cost, quality and safety.
- Reflect on feedback relating to the proposed design and make suitable changes in response.
- Illustrate the building design through a fully rendered 3D CAD model.
Subject Content
- Mixed commercial building project design
- National Construction Code (NCC) compliance
- Design solution evaluation with respect to Australian Standards and Planning regulations
- Iterative response to stakeholder feedback
Assessment
The following table summarises the standard assessment tasks for this subject. Please note this is a guide only. Assessment tasks are regularly updated, where there is a difference your Learning Guide takes precedence.
Type | Length | Percent | Threshold | Individual/Group Task | Mandatory |
---|---|---|---|---|---|
Applied Project | 3D CAD model | 30 | N | Individual | N |
Report | 1,500 words | 20 | N | Individual | N |
Applied Project | 3D CAD model and 2D drawings | 50 | N | Individual | N |
Teaching Periods
Spring (2024)
Parramatta - Victoria Rd
On-site
Subject Contact Marini Samaratunga Opens in new window
View timetable Opens in new window
Spring (2025)
Parramatta - Victoria Rd
On-site
Subject Contact Marini Samaratunga Opens in new window