CIVL 7015 Water Resources Systems Analysis
Credit Points 10
Legacy Code 301012
Coordinator Surendra Shrestha Opens in new window
Description Water resources projects are large infrastructure projects requiring huge capital expenditure. In addition, multiple options are usually available to meet the project goals but at different costs and under varying constraints. This unit presents the application of optimisation techniques to select the best project from a list of competing projects. Applications of these techniques to optimally allocate available water resources are discussed. These are presented within the context of maximising the return of investment.
School Eng, Design & Built Env
Discipline Water and Sanitary Engineering
Student Contribution Band HECS Band 2 10cp
Level Postgraduate Coursework Level 7 subject
Restrictions
Students must be enrolled in a postgraduate Engineering program undertaking a Civil Engineering major.
Assumed Knowledge
Discounting techniques, time value of money, equivalence analysis, present worth analysis, annual worth analysis, benefit-cost analysis, net benefit analysis, rate of return. Fluid properties, hydrostatics, open channel flow analysis, pipe network analysis, analysis and design of hydraulic structures, exposure to surface water hydrology and its components, water quality analysis.
Learning Outcomes
On successful completion of this subject, students should be able to:
- formulate and solve optimisation problems with specific application to water resources projects
- use linear and non-linear programming techniques in the decision making process (water resources projects)
- propose the best water resource project alternative from among various available options
- develop and implement decision support systems in selection of available water resources
- select and apply the most appropriate model from among commonly available water allocation models
- communicate effectively with peers and wider professional communities
Subject Content
1. Linear Programming principles
2. Non-linear Programming techniques
3. Engineering Economic theory
4. Water Allocation Models
5. Commonly used optimisation packages
Assessment
The following table summarises the standard assessment tasks for this subject. Please note this is a guide only. Assessment tasks are regularly updated, where there is a difference your Learning Guide takes precedence.
Item | Length | Percent | Threshold | Individual/Group Task |
---|---|---|---|---|
Project Report x 1 | 2500 words (plus appendices) (est.) | 85 | N | Individual |
Oral Presentation | 30-min oral presentation | 15 | N | Individual |
Teaching Periods