BLDG 1011 Property Building
Credit Points 10
Legacy Code 301157
Coordinator Laura Melo C E De Almeida Opens in new window
Description This unit provides students with an overview of regulations and construction techniques with an emphasis on low-rise residential buildings in the Australian context. It covers general process; building regulations; environmental issues; surveying techniques; structural elements (footings, framing and bracing); envelope; services; fit-out and finishes.
School Eng, Design & Built Env
Discipline Construction Engineering
Student Contribution Band HECS Band 2 10cp
Check your HECS Band contribution amount via the Fees page.
Level Undergraduate Level 1 subject
Incompatible Subjects BLDG 1001 Building 1 BLDG 1003 Building 1 (WSTC)
Restrictions Students must be enrolled in the Property Major in the Bachelor of Business.
Learning Outcomes
- Analyse and describe construction techniques required for low rise residential buildings including design of slab-on-ground and timber framing
- Select materials and appropriate construction techniques based on regulatory, safety and environmental analyses and communicate these via technical documentation
- Interpret building regulations pertinent to low rise residential buildings
- Apply simple land and building surveying techniques
- Analyse basic building services requirements for low rise residential buildings
- Recognise environmental and social connections with the built forms
- Identify typical low rise residential building defects and propose acceptable solutions
- Identify the problems associated with building low rise residential in hazardous locations
Subject Content
Housing styles
Design, documentation, tendering
Regulations
Surveying
Civil works and soil mechanics
Footing systems
Concrete slabs
Timber framing
Cladding
Services
Fit-out
Finishes
Building in hazardous locations
Alternative construction
Defects and faults
Assessment
The following table summarises the standard assessment tasks for this subject. Please note this is a guide only. Assessment tasks are regularly updated, where there is a difference your Learning Guide takes precedence.
Item | Length | Percent | Threshold | Individual/Group Task |
---|---|---|---|---|
Applied Project | as per building regulations - 1000 words | 25 | N | Individual |
Applied Project | 500 words | 25 | N | Individual |
Report | 2 Hour | 50 | N | Individual |
Prescribed Texts
- Wilkie, G 2011, Building your own home : a comprehensive guide for owner-builders, New Holland Publishers, Chatswood, N.S.W.
Teaching Periods
Autumn
Parramatta City - Macquarie St
Day
Subject Contact Laura Melo C E De Almeida Opens in new window
View timetable Opens in new window
Parramatta External
External
Subject Contact Laura Melo C E De Almeida Opens in new window